Serving Framingham & MetroWest

FDFraminghamDRIVEWAY PAVING

NEW ASPHALT DRIVEWAY INSTALLATION

New asphalt driveways built to last 20+ New England winters

Full tear-out, engineered base, and two-lift hot-mix asphalt — installed in one to two days by our own crew, not subcontractors.

New Asphalt Driveways in Framingham, MA

Most driveways in Framingham don't fail because of the asphalt — they fail because of what's underneath. Thin base, no drainage pitch, and one skinny lift of blacktop is why a five-year-old driveway looks twenty.

We build the base first. That's why our installs stay smooth while the cheap job down the street is already alligator-cracked.

What's included

Full excavation and haul-away

Old asphalt, roots, and soft soil come out and leave the property. Nothing gets paved over and hidden.

8" compacted reclaimed base

Processed gravel installed in lifts and rolled to spec, so frost heave has nowhere to move your driveway.

Two-lift hot-mix asphalt

A 2" binder course plus a 1.5" top course, laid hot and compacted with a 3-ton roller for a tight, sealed surface.

Proper pitch and hand-cut edges

Water is graded away from your garage and foundation, and edges are hand-cut and rolled so they don't crumble under tires.

Aprons, transitions, and cleanup

Clean tie-ins at the street and garage slab, lawn edges raked and seeded, and the site swept before we leave.

5-year written workmanship warranty

Covering cracking, settling, and drainage failure caused by our work — in writing, on your quote.

Is this the right fit for you?

  • Driveways with widespread cracking, potholes, or a crumbling base
  • Gravel or dirt driveways being paved for the first time
  • Widening, reshaping, or adding a parking pad or turnaround
  • Homes with water running toward the garage or foundation

Not sure? Send a photo with your quote request and we'll tell you straight — even if the answer is a smaller job than you expected.

Questions we get asked

How long does a new driveway installation take?
Most two-car residential driveways are a one- to two-day job. Tear-out and base prep on day one, paving on day two. You can walk on it immediately and park on it after about 48 hours in warm weather.
Can I get a new driveway installed in winter?
Hot-mix asphalt needs ground temperatures around 50°F or above to compact correctly, so we install April through early November in Massachusetts. Winter is the right time to book and lock in a spring date.
Do I need a permit in Framingham?
Work that touches the town apron or right of way typically needs a street-opening permit. We handle the paperwork and inspections as part of the job.

Other services

Get an itemized quote for your new asphalt driveway

Free on-site measurement, written itemized quote, and an honest answer about whether you need a full replacement or just an overlay.

Call nowFree quote